On request
Panattoni City Logistics Kraków III
Kraków-Nowa Huta, Łęg
Available area
214 135 m²
Existing area
0 m²
Under construction
57 459 m²
Planned area
163 176 m²
The 7R Hub Nowa Huta complex is a modern A-class logistics project, developed by 7R in Kraków. The investment is in the construction and planning phase, providing tenants with a wide range of options for adjusting the floor space. In building B1, which is under construction (planned for 2027), 50,959 sq m are available. The remaining facilities are in the planning phase and offer full availability: B2 (93,698 sq m), B3 (58,278 sq m), and B4 (11,200 sq m). The spaces have been designed with the highest operational standards in mind.
Key technical parameters:
The entire facility is certified under the BREEAM Excellent system and equipped with photovoltaic installations and intelligent DALI lighting.
| Name | Total area | Warehouse area | Office area | Status | Year built | Storage height | Floor load capacity | Column grid | Fire load | Sprinklers | LED lighting | Smoke vents | Overhead crane | Railway siding | Loading docks | Level-access doors |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B1 | 57 459 m² | 57 459 m² | — | UnderConstruction | 2027 | 10,00 m | 7 000 kg/m² | 12 x 22,5 | 4000 | yes | yes | yes | no data | no data | — | — |
| B2 | 93 698 m² | 93 698 m² | — | Planned | — | 10,00 m | 7 000 kg/m² | 12 x 22,5 | 4000 | yes | yes | yes | no data | no data | — | — |
| B3 | 58 278 m² | 58 278 m² | — | Planned | — | 10,00 m | 7 000 kg/m² | 12 x 22,5 | 4000 | yes | yes | yes | no data | no data | — | — |
| B4 | 11 200 m² | 11 200 m² | — | Planned | — | 10,00 m | 7 000 kg/m² | 12 x 22,5 | 4000 | yes | yes | yes | no data | no data | — | — |
The complex is being built in Kraków's Nowa Huta district, which guarantees operations within a strong sales market. The Małopolska region provides excellent access to qualified engineering staff, educated at universities such as AGH or UJ, which is crucial for advanced logistics and production processes. The location on Igołomska Street enables efficient access towards the A4 motorway, opening a fast transit corridor to the south of Europe, including easy access to the Slovak and Czech markets.
Access to public transport should be taken into account in recruitment plans. In the vicinity, at a distance of about 1.1 km from the investment site, there are several bus stops serving the Kraków city network. Although this is within walking distance, for intensive shift work, tenants should consider organizing additional transport for employees, which will optimize HR processes and facilitate daily commuting.
On request
Kraków-Nowa Huta, Łęg
On request
Węgrzce Wielkie
On request
Kraków