Logistics centre
7R Hub Nowa Huta

Kraków-Nowa Huta · ul. Igołomska

Available area

214 135 m²

Existing area

0 m²

Under construction

57 459 m²

Planned area

163 176 m²

Key facts

Amenity HGV parking
Amenity Manoeuvring yard
Amenity Fenced site
Amenity Security
Amenity CCTV monitoring
Amenity Photovoltaics
Amenity Green areas
Amenity DALI system
Certificate breeamexcellent

Description

The 7R Hub Nowa Huta complex is a modern A-class logistics project, developed by 7R in Kraków. The investment is in the construction and planning phase, providing tenants with a wide range of options for adjusting the floor space. In building B1, which is under construction (planned for 2027), 50,959 sq m are available. The remaining facilities are in the planning phase and offer full availability: B2 (93,698 sq m), B3 (58,278 sq m), and B4 (11,200 sq m). The spaces have been designed with the highest operational standards in mind.

Key technical parameters:

  • Clear height: 10 m
  • Dust-free floor load capacity: 7 t/sq m
  • Increased fire resistance: >4000 MJ/sq m
  • Ecological heating: heat pumps

The entire facility is certified under the BREEAM Excellent system and equipped with photovoltaic installations and intelligent DALI lighting.

Buildings

Name Total area Warehouse area Office area Status Year built Storage height Floor load capacity Column grid Fire load Sprinklers LED lighting Smoke vents Overhead crane Railway siding Loading docks Level-access doors
B1 57 459 m² 57 459 m² — UnderConstruction 2027 10,00 m 7 000 kg/m² 12 x 22,5 4000 yes yes yes no data no data — —
B2 93 698 m² 93 698 m² — Planned — 10,00 m 7 000 kg/m² 12 x 22,5 4000 yes yes yes no data no data — —
B3 58 278 m² 58 278 m² — Planned — 10,00 m 7 000 kg/m² 12 x 22,5 4000 yes yes yes no data no data — —
B4 11 200 m² 11 200 m² — Planned — 10,00 m 7 000 kg/m² 12 x 22,5 4000 yes yes yes no data no data — —

Location and transport

Location

The complex is being built in Kraków's Nowa Huta district, which guarantees operations within a strong sales market. The Małopolska region provides excellent access to qualified engineering staff, educated at universities such as AGH or UJ, which is crucial for advanced logistics and production processes. The location on Igołomska Street enables efficient access towards the A4 motorway, opening a fast transit corridor to the south of Europe, including easy access to the Slovak and Czech markets.

Public transport

Access to public transport should be taken into account in recruitment plans. In the vicinity, at a distance of about 1.1 km from the investment site, there are several bus stops serving the Kraków city network. Although this is within walking distance, for intensive shift work, tenants should consider organizing additional transport for employees, which will optimize HR processes and facilitate daily commuting.

Public transport
Bus stop Kraków Nowa Huta 1105,4 km
Bus stop Brama nr 8 01 1219,4 km
Bus stop Brama nr 8 02 1251,3 km
Bus stop Pleszów 1267,9 km
Bus stop Pleszów 05 1273,3 km
Bus stop Wadów Glinik 01 1275,3 km
Bus stop Pleszów 03 1278,9 km
Bus stop Wadów Glinik 02 1279,7 km
Bus stop Pleszów 04 1284,8 km

Other logistics centres nearby

See all listings
Panattoni City Logistics Kraków III
New

On request

Panattoni City Logistics Kraków III

Kraków-Nowa Huta, Łęg

Total area 24 600 m²
Warehouse area —
Plot area —
Year built —
7R Park Kraków I (Węgrzce Wielkie)
New

On request

7R Park Kraków I (Węgrzce Wielkie)

Węgrzce Wielkie

Total area 19 500 m²
Warehouse area —
Plot area —
Year built —
7R Park Kraków IX
New

On request

7R Park Kraków IX

Kraków

Total area 33 322 m²
Warehouse area —
Plot area —
Year built —